Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine

Product Details
Customization: Available
After-sales Service: 1year
Warranty: 1year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
20000000 RMB
Plant Area
>2000 square meters
  • Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
  • Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
  • Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
  • Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
  • Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
  • Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Find Similar Products
  • Overview
  • Product Description
  • Specification
  • FAQ
Overview

Basic Info.

Model NO.
YH-05
Type
Domestic Sewage Treatment
Method
Biological Treatment
Usage
Industrial, Home, Agriculture, Hospital
Material
Carbon Steel;Stainless Steel
Lift Pump
Two
Disinfect
Disinfection by Ultraviolet Light;Chlorine Dioxide
Structure
Container Style
Size
4.0*1.5*2.0m
Color
Customization
Blower
One
Voltage
Customization
Electronic Control
Contain
Weight
2200kg
Manhole
Contain
Heat Preservation
Optional
Electric Heat Tracing
Optional
Brand
Yh&Customization
Antiseptic
Paint Anticorrosion
Transport Package
Standard Export Packing
Specification
1m³ /h
Trademark
YH
Origin
China
HS Code
8421219990
Production Capacity
1000 Units/Year

Packaging & Delivery

Package Size
500.00cm * 300.00cm * 300.00cm
Package Gross Weight
3000.000kg

Product Description

INTEGRATED SEWAGE TREATMENT PLANT
The integrated sewage treatment equipment achieves efficient degradation of organic matter, ammonia nitrogen and total phosphorus in sewage through the synergistic effect of highly active biological fillers and intelligent control systems, and the effluent is stable and meets international standards. Compared with traditional processes, the system's shock load resistance is increased by 40%, energy consumption is reduced by 30%, and there is no need to frequently replace fillers, saving more than 50% in operation and maintenance costs.
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Product Description
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine
Specification
Brand
Model
capacity
Area
Air Blower
Contact oxidation zone
m³/h
m2
blast capacity
Power
units
YH
or
customized
YHDS-1
1
8
1.03
0.75
2
5
YHDS-2
2
10
1.95
2.2
2
10
YHDS-3
3
17
2.62
3
2
15
YHDS-5
5
25
3.95
4
2
24
YHDS-10
10
50
8.13
7.5
2
45
YHDS-20
20
70
16
15
2
80
YHDS-35
35
120
26.3
22
2
140
FAQ
Q: Can you put my company brand (logo) on the products?
A: Yes, we support OEM/ODM service. The customization process is as follows:
1: Customers put forward personalized customization requirements.
2: Our engineer draws the design draft.
3: Customer confirms the design draft. 
4:Factory start to produce shipment. 
Q: How to pay?
A: TT and L/C are acceptable.
Q: What is the lead time of the shipment?
A: It depends on order quantities. Generally the delivery time will be within 2 to 4 weeks. Contact us for the exact time.
Q: What is your Warranty?
A: We provide a one-year Warranty.
Pig Farm Wastewater Treatment Package Sewage Treatment Plant Machine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now